The asset BEBO Arch Bridge for Chapel Road Camborne, East West Link Road, was a twin span arch construction. This asset BEBO Arch consisted of 36 rings  for a C42T design spanning 2 x 12.8m with a rise of 6.5m. The structure build was square ended with MSE head- and wingwalls and precast road parapets. The main contractor for the project was Carillion.

The T94 Arch Bridge Structure was installed over the Milestone Canal. It spans 28.6 metres with a height of only 3.2 metres. Over 60 precast units were made to achieve the total length of 36.735 metres.