Moore Concrete supplied the standing walls for the prestigious Ebrington Parade Ground Regeneration at Londonderry. The walls were manufactured with special textured timber finish. The project, which is now known as the Ebrington Public Realm, was completed by SIAC Construction. Moore Concrete also supplied precast beams and slabs to the project with special 'glass' inserts between the beams.